©CC BY-NC-SA 4.0
🚩加入 Nostr!moe 社区: https://join.nostr.moe
#吐槽

In reply to nevent1q…j0m5
_________________________

I finally found the problem... It has to do with the `noscraper` option in the config file, which when true causes the configuration of `authorized_keys` to invalid.

via Nostr@cxplay Short Text Note by Yonle (reply)
#吐槽

In reply to nevent1q…6ux9
_________________________

Yes, I have completely rebooted. I even tried to &LTnode bostr_cli.js start config.js>, but it still doesn't work. And I tried checkconf, no problems, I don't know why.

via Nostr@cxplay
#吐槽

In reply to nevent1q…3vqv
_________________________

I have the same concern. I found that NIP-42 read authentication doesn't seem to work, I set authorized_keys but still everyone can read my bouncer.

via Nostr@cxplay
#吐槽

In reply to nevent1q…supy
_________________________

Although it can be launched in the sandbox, it cannot be used normally and the interface cannot be operated

via Nostr@cxplay
#吐槽

In reply to nevent1q…s8g7
_________________________

Can't launch on Windows 11 23H2(22631.3880)🤷‍♂️But it works in my Windows sandbox(22H2, 22631.3880), I suspect it's a problem with the WebView2 Runtime (it's not pre-installed in the sandbox).

via Nostr@cxplay
#吐槽

In reply to nevent1q…4m6t
_________________________

说起来 Amethyst 确实也有这种跳转, 但没有这么频繁. Amethyst 似乎是在草稿删除的时候会出这种情况.

via Nostr@cxplay Short Text Note by DASHU (reply)
#吐槽

In reply to nevent1q…p5px
_________________________

理想很美好, 现实很骨感. 就算是限制了只允许在可信过滤器中用, 但还是只允许 same-origin 重定向, 没意思. 大号的 removeparam 修饰符罢了.

via Nostr@cxplay Short Text Note by CXPLAY
#吐槽

In reply to nevent1q…us3d
_________________________

$50 买只鼠标用四年 vs $200 买只鼠标一直用*

*此处的 "一直" 是指在产品硬件生命周期内永远提供软件更新, 用于硬件损耗替换的部件需用户另行购买.
*本产品免费提供的易损替换件仅包括脚垫. 微动开关, 滚轮, 鼠标外壳和数据线等其他易损件请自行致电询问当地经销商.
*部分附件不提供更换选项, 如: 防滑贴, 产品包装与说明书.
*由于客户擅自使用非官方替换件造成的鼠标驱动软件锁定硬件造成的硬件不可用状态不包含在保障服务范围内.
*中国大陆地区(港澳台除外)的保障由xxxxx技术有限公司提供授权服务支持.

via Nostr@cxplay
#article #read

罗技讨论订阅制鼠标

罗技 CEO Hanneke Faber 在&ampnbsp; The Verge 的 Decoder 播客节目中讨论了能永久性使用的鼠标,她表示挑战在于寻找到一种商业模式。这种鼠标的硬件不需要改动,但能通过软件获得持续更新,她表示一种可选的商用模式是订阅制。Faber 称,罗技的创新中心向她展示了一款能永久使用的鼠标,其价格可能在 200 美元左右,比绝大多数鼠标都贵,因此可能主要面向专业人士或爱好者。鼠标能持续获得软件更新,提供很多可编程性和宏支持。订阅模式日益受到企业欢迎,因为相比一次性的硬件销售,它能提供一种更可靠更持久的收入来源。

- https://arstechnica.com/gadgets/2024/07/logitech-has-an-idea-for-a-forever-mouse-thatrequires-a-subscription/
- https://www.solidot.org/story?sid=78840

via Nostr@cxplay_clip Logitech has an idea for a “forever mouse” that requires a subscription
#吐槽

#nostrmo 用 Amber (NIP-55) 即使授权了中继的客户端验证权限, 还是会突然后台弹出授权质询然后立马跳回来, 很怪. DASHU (npub19ye…zqwk)

via Nostr@cxplay
123云盘域名被反诈中心拦截

123云盘域名(www.123pan.com)被反诈中心拦截, 官方公告称是由于不正当竞争, 收款渠道遭到虚假交易后被举报导致, 目前已向公安机关报案处理.

目前可使用 www.123pan.cn 域名做替换访问, 直链域名(vip.123pan.cn)可用 vip.cjjd17.com 做替换访问.

● 关于123云盘部分地区访问失败公告 - 微信公众号

实际早在数个月前, 产品用户群内就开始收到有部分省份频发的 DNS 污染反馈, 123pan.cn 域名也至少在一个月前就已经被启用用作主站的备用域名.


#123云盘

via CXPLAY's Memos
#吐槽

已知一年实际有 365.242199 天, 所以 Microsoft 365 一年里能工作的时间占比是 99.933644109589%, 比起 AWS S3 不知道多少个 9 的 SLA, 偶尔还是能宕点机的.

via Nostr@cxplay Short Text Note by CXPLAY
CXPLAY World
Sticker
Telegram 的 WebP 支持还是这么抽象.
#吐槽

mery 专一地画了至少七年《冰菓》同人, 最后的结局是被网暴退圈.🤦‍♂️我要将其称之为京都动画纵火犯的网络版.

via Nostr@cxplay
Back to Top